Contract intelligence for construction and infrastructure

Infiny reads the contracts, letters, and programmes on your project. Track each notice and time bar, draft replies in minutes, and prove delay with the page behind every fact.

Project Brain›
Across the Particular Conditions and the Section A1 correspondence: when was full land handover due and when did it happen? Was VCON’s notice inside the Sub-Clause 20.1 window, and what are we claiming? Can the Employer levy delay damages yet, and what does the Engineer’s slow-progress notice require from us?
Reading the project record

Used by contractors, PSUs, and their advisers

AKS Partners logo
Dedicated Freight Corridor logo
Evident logo
DMRC logo
Jakson Group logo
Jinfra logo
Texmaco logo
Nippon KOEI India logo

The problem

One missed notice can sink a valid claim.

A large package produces tens of thousands of letters, diaries, minutes, and programme updates. The facts that decide entitlement are scattered across them, and the people who knew where to look have often moved on by the time the claim is assessed.

Missed time bars

Missed time bars

Every contract and subcontract sets its own notice periods. Miss one by a day and a valid claim can be rejected outright.

Scattered evidence

Scattered evidence

Proving one delay event takes the instruction, the site diary, the notice, and the programme update. They are usually filed in four different places.

Senior time spent searching

Senior time spent searching

Planning engineers and contract managers spend days tracing documents and drafting routine replies instead of running the project.

Every format

If it's on the project, Infiny reads it.

Contracts in PDF, letters in Word, handwritten site diaries, programmes in Excel, drawings in DWG, and models in IFC. Infiny reads what each file says, so you find documents by their content, whatever they were named.

  • Whole archives

    Upload folders and zip files. Years of correspondence go in at once.

  • Scans & handwriting

    Scanned letters, site diaries, and marked-up drawings are read with OCR, handwriting included.

  • Drawings & models

    Plans, sections, and BIM elements become records you can ask about and cite.

  • Cl. 20.1 · 28-day notice

    PDF

    .pdf

  • Word

    .docx · .doc

  • Handwritten

    diaries · markups

  • Unstructured

    emails · photos · scans

  • Tables

    inside any document

  • Excel

    .xlsx · .csv

  • PowerPoint

    .pptx

  • DWG

    .dwg

  • CAD

    plans · sections

  • 3D BIM

    .ifc

EOT claims service

Delayed project? We'll draft the EOT claim.

Send the contract, the programme updates and the letters for one delayed project. We run the analysis and send back the claim in your format, ready for your expert to review and sign.

Drafting by hand
2–3 weeks
With Infiny
48 hours
from our call to the claim in your inbox
  • Reading the record

    By handAn analyst works through thousands of letters, notices and site diaries one at a time, building the chronology in a spreadsheet.

    With InfinyEvery letter, notice and programme update is read and dated before our call, so the call goes on agreeing the events.

  • Writing the claim

    By handWritten from a blank page, or pasted from the last claim and reworked paragraph by paragraph.

    With InfinyAI drafts it in your format: your template, your headings, your defined terms, in the order the Engineer reads it.

  • Citing the evidence

    By handReferences go in at the end if time allows, and the gaps surface in the Engineer's response.

    With InfinyEvery paragraph cites the letter, page and date it came from. Where the record is thin, the draft says so.

  • Checking the time bars

    By handNotice clauses are often checked after the claim is written, when it is too late to change the story.

    With InfinyEach event is checked against your contract's notice clause, and time-barred events are flagged for you to decide on.

What lands in your inbox

A Word file in your format, with every paragraph footnoted to its source.

When the Engineer asks where a date came from, the answer is already in the footnote: the letter, its date and the page.

See everything you receive
DE-02 Right of way – EOT claim.docx

Draft for expert review

3. Chronology of Events

3.4On 14 March 2021 the Engineer instructed the Contractor to suspend earthworks between Ch. 12+400 and Ch. 13+150 pending the handover of the land.1

3.5The Contractor gave notice of its claim under Sub-Clause 20.1 on 2 April 2021, within 28 days of the instruction.2

3.6The Employer confirmed possession of plots 41 to 47 for 9 August 2021, after which the earthworks resumed.3

  1. 1Letter ENG-L-0412, Engineer to Contractor, 14 March 2021, p. 2.
  2. 2Letter CTR-L-0877, Contractor to Engineer, 2 April 2021, p. 1.
  3. 3Letter EMP-L-0153, Employer to Engineer, 21 July 2021, p. 1.

7

  • EOT claim drafting

    A claim file per delay event, as Word files your expert can edit, cited paragraph by paragraph.

  • Delay analysis

    Run on your Primavera updates: the critical path, Key Dates and days claimed, with the method chosen to fit your records.

  • Expert review, if you want it

    We bring in an independent delay expert to review the analysis and the narrative before it goes to the Engineer.

For contracts in the Gulf and India. Fees and scope are agreed on the call, before any work starts.

Who it's for

Built for both sides of the contract.

Contractors, PSUs, Engineers, and delay and quantum experts all work from the same contract and the same project record. Infiny gives each of them the facts, with the source attached.

  • Contractors & EPC firms

    Give notice on time and protect your entitlement to time and money.

  • PSUs & employers

    Assess EOT and cost claims against the contract and the site record.

  • Engineers & PMCs

    Administer the contract and support determinations with the record.

  • Delay & quantum experts

    Build chronologies and delay analyses from source documents.

  • Lawyers & arbitrators

    Prepare pleadings and evidence with every fact traced to its source.

  • Rail & metro

    Multi-package corridors and metro lines where interface delays and possession blocks build into claims over years of letters.

    Explore rail & metro
    • FIDIC
    • DFC
    • Metro GCC
  • Roads & highways

    EPC, HAM, and item-rate packages with milestone payments, damages, and steady correspondence with the Authority.

    • MoRTH EPC
    • NHAI HAM
    • FIDIC
  • Energy & industrial EPC

    Plants and process works with vendor packages, performance guarantees, and back-to-back subcontracts.

    • FIDIC Silver
    • LSTK
    • NEC4
  • Buildings & urban infra

    Public buildings, water, and urban works where BOQ quantities, variations, and extensions decide the margin.

    • CPWD GCC
    • PWD
    • JCT

Customers

What railway PSUs, law firms, and arbitrators say about Infiny.

DFCCIL
We can now map an entire chronology across thousands of pages in minutes. It moved our workflow from searching for facts to strategising around them.
Akshay Kaushal

Akshay Kaushal

DFCCIL

AKS Partners
Finding specific clauses or historical dates is now instantaneous. Reviewing voluminous documents is faster, clearer, and far less cumbersome.
Ayan K. De

Ayan K. De

Partner · AKS Partners

Legacy Law Offices
Infiny helps us prepare high-quality first drafts of complex arbitration documents with greater speed, consistency, and precision.
Vandana Randhawa

Vandana Randhawa

Director · Legacy Law Offices

Empanelled Arbitrator

Faster cross-referencing of provisions, pleadings, and evidence lets me focus less on searching and more on reasoning.
Chahatey Ram

Chahatey Ram

Ex. DRM Railways · Empanelled Arbitrator

Security

ISO 27001 certified, with every client's data kept separate.

Contracts, claims, and correspondence are commercially sensitive. Infiny keeps them private, isolated, and auditable. We do not train models on your files or sessions.

Delay_Notice_19Mar.pdf
AES-256 protected

NOTICE OF DELAY · DN/M14/014

Site Access Instruction, 14 March 2025

Critical path A1020 → A1410

Extension of time requested: 14 days

Meridian Construction Ltd

In transit
At rest · AES-256
ISO 27001Information security certified

No model training

Your files and sessions are not used to train models.

Tenant isolation

Each client's data is segregated by tenant.

FAQ

Questions teams ask before they start.

Didn't find your question?

Ask the team on a call

Know every contract inside out
Book a demo to see Infiny on documents like yours.
BOOK A DEMO
© 2026 North Star Intellisoft Pvt. Limited
infiny